Our Projects

Completion of 24/7 Continuous Pressurized Water Supply

Project Achievement: Completion of 24/7 Continuous Pressurized Water Supply System for Jasin and Merlimau, Melaka.

We are pleased to report the successful completion of the Design, Construction, and Operation of a fully pressurized, continuous 24/7 water supply distribution system serving the areas of Jasin and Merlimau, Melaka.

The project encompassed a comprehensive scope of infrastructure development, including the establishment of 60,000 metered service connections, construction of five elevated reservoirs (3.0 million liters each), three ground storage tanks (4.0 million liters each), three booster pump stations, and the deployment of an integrated SCADA system with smart metering and telemetry for centralized operational control.

Following commissioning, we undertook the operation and maintenance of the system, ensuring service continuity, system integrity, and optimal performance across the distribution network.

Throughout the operation and maintenance period, all key contractual performance indicators were successfully achieved, including:

  • A minimum 98% daily water supply continuity across the service network;

  • Reduction of Non-Revenue Water (NRW) to below 18% within the first operational year;

  • Full compliance with Ministry of Health (MOH) and Suruhanjaya Perkhidmatan Air Negara (SPAN) drinking water quality standards.

The system incorporated real-time monitoring, data-driven management, and predictive maintenance strategies, delivering enhanced operational efficiency and reliability.

The successful delivery of this project reflects our ongoing commitment to engineering excellence, operational best practices, and sustainable infrastructure development. We remain dedicated to delivering critical utility projects that strengthen public service delivery and contribute positively to the communities we serve.

MUDA RIVER WATER SCHEME PHASE 4A, PACKAGE 12 - SUNGAI DUA WATER TREATMENT PLANT.

DESIGN, ENGINEERING, CONSTRUCTION, AND COMMISSION OF COMPLETE WATER TREATMENT PLANT WITH A CAPACITY OF 180 MLD.

SUNGAI BAYOR WATER TREATMENT PLANT AT SUNGAI BAYOR 2, SELAMA, PERAK.

DESIGN AND BUILD NEW WATER TREATMENT PLANT WITH OPERATING CAPACITY 5MGD AND UPGRADING OF EXISTING PLANT.

DESIGN, ENGINEERING AND CONSTRUCTION

MUDA RIVER WATER SCHEME PHASE 4A, PACKAGE 10 - SUNGAI DUA WATER TREATMENT PLANT.


LANGAT 2 WATER TREATMENT PLANT, SELANGOR

SUPPLY, INSTALL AND COMMISSION COMPLETE MECHANICAL SCOPE EQUIPMENT FOR A NEW 130 MLD PROCESS TREATMENT UNIT.

Proposed Development of Langat 2 Water Treatment Plant and Water Reticulation System in Selangor Darul Ehsan/Wilayah Persekutuan Kuala Lumpur, Phase 1. Package 2A – Construction and Completion of 230 MLD, Langat 2 Water Treatment Plant Project